In February 2010, the building that has historically housed the Goethe- Institute was damaged by earthquake. While FAR continues work on the historic structure, an interim solution was needed, but one with a complete character and integrity of its own. The temporary Cultural Institute is to be installed on an unfinished floor in an office high-rise. The space is characterized by a large depth of 16m between core and façade, but with only limited space for class-rooms, library, office, event- and exhibition space.